On the books. On site. Off the workshop floor.

A rolling selection of recent commercial work. Click any project for the full case study, including before, during and after. Filter by sector or by service to see the work that's closest to yours.

Sector
Service
Thomas Danby College, Demolish & Rebuild
Demolition & Rebuild

Leeds · 5 acres

Thomas Danby College, Demolish & Rebuild

Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.

View case study
Ilkley Train Station, Canopy Restoration
Heritage Restoration

Ilkley

Ilkley Train Station, Canopy Restoration

Stripping a corroded Victorian platform canopy back to structure and reglazing it in aluminium and glass, with a later plaza canopy.

View case study
Cygnet Hospital Harrogate, Bedroom Upgrades
Healthcare

Harrogate

Cygnet Hospital Harrogate, Bedroom Upgrades

Phased upgrade of patient bedrooms and en-suites in a live mental-health hospital, finished to clinical standards.

View case study
Warehouse Refurbishment, Pontefract
Industrial Refurbishment

Pontefract

Warehouse Refurbishment, Pontefract

A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.

View case study
Ropergate, Pontefract, Stone & Brick Restoration
Heritage Restoration

Pontefract

Ropergate, Pontefract, Stone & Brick Restoration

Sensitive masonry restoration of a listed Pontefract frontage: stone repair, repointing and roofline works.

View case study
Land Rover Wakefield, Workshop Floor
Automotive / Retail

Wakefield

Land Rover Wakefield, Workshop Floor

A new heavy-duty concrete workshop floor and drainage for a live Land Rover dealership.

View case study
Office & Retail Fit-Out, Pontefract
Commercial Fit-Out

Pontefract

Office & Retail Fit-Out, Pontefract

A compact commercial building fitted out for modern use: shop floor, reception, open-plan office and kitchenette.

View case study
Grade A Office Refurbishment, Stourton, Leeds
Design & Build Fit-Out

Stourton, Leeds

Grade A Office Refurbishment, Stourton, Leeds

A dated office taken back to its structure and rebuilt as Grade A workspace, delivered as one turnkey design and build package inside and out.

View case study
Connex 30 Office & Warehouse Fit-Out, Cross Green, Leeds
Internal Fit-Out

Cross Green, Leeds · 9,500 sq ft

Connex 30 Office & Warehouse Fit-Out, Cross Green, Leeds

9,500 sq ft of shell fitted out end to end, from metal stud partitions and ceilings to the gas, ductwork and distribution boards behind them.

View case study
Office, Canteen & Washroom Refurbishment, Sheffield
Refurbishment & M&E

Halfway, Sheffield · 2,100 sq ft

Office, Canteen & Washroom Refurbishment, Sheffield

Two new staff canteens, three washrooms rebuilt from the walls in and a full rewire, delivered around a business that never stopped trading.

View case study
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
Landlord Works & Subdivision

Morley, Leeds · 40,000 sq ft

40,000 sq ft Subdivided into Nine Units, Morley, Leeds

One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.

View case study
Warehouse Dilapidations & Reinstatement, Ossett, Wakefield
Dilapidations

Ossett, Wakefield · 3,000 sq ft

Warehouse Dilapidations & Reinstatement, Ossett, Wakefield

A unit handed back full of a departed tenant's fixtures, stripped to slab and returned to the market as a clean, brighter, better-rated blank canvas.

View case study
Industrial Refurbishment for DX, Haigh Park, Stourton
Industrial Refurbishment

Stourton, Leeds · 6,200 sq ft

Industrial Refurbishment for DX, Haigh Park, Stourton

A dated distribution building re-clad, re-shuttered and rebuilt internally, handed over ready for a national parcels operator to move in and start running.

View case study
7,000 sq ft Warehouse Roof Replacement, Midland Road, Leeds
Roofing & Cladding

Midland Road, Leeds · 7,000 sq ft

7,000 sq ft Warehouse Roof Replacement, Midland Road, Leeds

An old profile-clad roof stripped and replaced with insulated composite panel over a working warehouse, with safety netting installed before a single sheet came off.

View case study
Commercial Unit Recladding, Kettlestring Lane, York
External Envelope

Kettlestring Lane, York · 1,600 sq ft

Commercial Unit Recladding, Kettlestring Lane, York

A stained, rusting elevation stripped back and re-clad with new insulation, turning a unit that would not let into one that shows well before anybody gets through the door.

View case study
Structural Openings for Gear4Music, York
Structural Alterations

Kettlestring Lane, York · 280 sq ft

Structural Openings for Gear4Music, York

Two structural openings cut through a double-skin blockwork wall to the engineer's specification, forming forklift and pedestrian routes inside a live factory.

View case study
Suzuki Dealership Overcladding, Hunslet, Leeds
External Envelope

Hunslet, Leeds

Suzuki Dealership Overcladding, Hunslet, Leeds

A brick extension overclad in anthracite to match the main dealership, turning an obvious afterthought into part of the building.

View case study
Retail Dilapidations under JCT Contract, Pickering
Dilapidations

Market Place, Pickering

Retail Dilapidations under JCT Contract, Pickering

A mid-terrace market town shop tendered, won and delivered under a JCT contract, stripped out, made weather tight and handed back ready to let.

View case study

Have a project we should know about?

Whether you've got a fixed brief, a vague idea or just a problem with the building, we'll come out for a free survey and give you something straight in writing.

Part of The AB Group

One family. A group of companies.

Call us