External Works
Pond Walkway Refurbishment, Kings Business Park, Prescot
A failing timber walkway, tipping towards the pond at the heart of a business park, replaced with a composite system built to last in the wet.
- Location
- Prescot, Knowsley
- Sector
- Commercial Office & Workplace
- Completed
- 2026
The brief.
Delivered asDemolition, Composite Decking, External Works, Landscaping
Kings Business Park needed its central pond walkway put right, and quickly. The timber decking boards had degraded badly, and the original timber substructure was slowly tipping towards the water. For the people who work on the park and visit it, that was a real and growing safety risk.
Rather than patch it and come back in a few years, we engineered and proposed a complete upgrade to a high-specification composite system, chosen for long-term structural integrity, durability and low maintenance.
The old frame was already leaning into the pond, so it was carefully stabilised before it was taken apart. The new composite substructure will not rot in a permanently damp setting. The thicker composite profiles also needed careful detailing where deck meets ground, so we re-profiled the adjacent land and fitted vertical tongue-and-groove fascia skirting, giving a continuous transition from ground to deck and clean lines along the whole perimeter.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Controlled removal of the unstable timber walkway structure
- 02 Offsite disposal through dedicated waste streams
- 03 Composite substructure, supplied and installed
- 04 Heavy-duty composite decking boards
- 05 Integrated safety handrailing along the full run
- 06 Perimeter trim and edging detail
- 07 Vertical tongue-and-groove composite cladding around the base, concealing the substructure
- 08 Surrounding ground regraded and redressed to suit the deeper deck profile
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
3In progress
6Completed
6What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Pontefract
Office & Retail Fit-Out, Pontefract
A compact commercial building fitted out for modern use: shop floor, reception, open-plan office and kitchenette.
View case study
Stourton, Leeds
Grade A Office Refurbishment, Stourton, Leeds
A dated office taken back to its structure and rebuilt as Grade A workspace, delivered as one turnkey design and build package inside and out.
View case study
Cross Green, Leeds · 9,500 sq ft
Connex 30 Office & Warehouse Fit-Out, Cross Green, Leeds
9,500 sq ft of shell fitted out end to end, from metal stud partitions and ceilings to the gas, ductwork and distribution boards behind them.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.