New Windows Cut into Composite Cladding, Wath
Seven new windows cut through the composite cladding of a 13,500 sq ft unit, bringing daylight into a new tenant's laboratory and office areas.
- Location
- Tanfield Lane, Wath, Ripon
- Size
- 13,500 sq ft
- Sector
- Industrial & Logistics
- Completed
- January 2018
The brief.
Delivered asCladding Alterations, Windows
A new tenant wanted natural daylight in the areas of the unit it planned to use as a laboratory and offices. We were asked to cut openings through the cladding to the perimeter walls and install new windows.
The cladding was a combination of 100mm and 40mm core composite panel. We marked out and cut the seven openings the client specified, added aluminium framework to each opening and inside the unit, forming extra purlins and columns where they were needed for support, and boarded the openings with plywood overnight to keep the building secure and dry. The windows went in with top openers where specified, finished Rosewood outside to match the existing windows and white inside, with exterior flashings coloured to match.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Seven openings marked out and cut in 100mm and 40mm core composite cladding
- 02 Additional aluminium framework to each opening
- 03 Extra purlins and columns installed inside the unit for support
- 04 Openings secured overnight with plywood
- 05 Seven 1200mm x 1000mm windows supplied and installed, with top openers where specified
- 06 Rosewood exterior to match the existing windows, white interior
- 07 Exterior flashings coloured to match the cladding
In progress
4Completed
3What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Pontefract
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.