Roofing & Cladding
Roof Repair & Repointing, York
Weatherproofing works after water ingress, carried out from an independent scaffold: new flashings, replacement tiles and repointed coping stones.
- Location
- York
- Sector
- Commercial Office & Workplace
- Completed
- 2026
The brief.
Delivered asRoof Repairs, Flashings, Repointing, Scaffolding
Water had been getting into the client's property in several places. Following a structural survey, we attended site to carry out the weatherproofing works needed to stop it.
We designed and erected an independent scaffold beside the main entrance facade, giving safe access to the elevated parapets, the flat roof and the plant room. From there we removed and replaced the degraded perimeter roof flashings along the critical abutments, replaced damaged roof tiles around the complex high-level transitions and the solar panels, renewed the foam fillers in the flashing details around the plant room cladding, and repointed and relaid the coping stones where the building was damaged.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Independent scaffold designed and erected beside the main entrance facade
- 02 Access to elevated parapets, flat roof and plant room
- 03 Degraded perimeter roof flashings removed and replaced
- 04 Damaged roof tiles replaced around high-level transitions and solar panels
- 05 Foam fillers replaced in the flashing details around the plant room cladding
- 06 Coping stones repointed and relaid in damaged areas
Completed
5More projects.
Pontefract
Office & Retail Fit-Out, Pontefract
A compact commercial building fitted out for modern use: shop floor, reception, open-plan office and kitchenette.
View case study
Stourton, Leeds
Grade A Office Refurbishment, Stourton, Leeds
A dated office taken back to its structure and rebuilt as Grade A workspace, delivered as one turnkey design and build package inside and out.
View case study
Cross Green, Leeds · 9,500 sq ft
Connex 30 Office & Warehouse Fit-Out, Cross Green, Leeds
9,500 sq ft of shell fitted out end to end, from metal stud partitions and ceilings to the gas, ductwork and distribution boards behind them.