Healthcare
Cygnet Hospital Harrogate, Bedroom Upgrades
Phased upgrade of patient bedrooms and en-suites in a live mental-health hospital, finished to clinical standards.
- Location
- Harrogate
- Sector
- Healthcare & Life Sciences
- Completed
- 2016
The brief.
Delivered asRefurbishment & Fit-Out
A phased upgrade programme of patient bedrooms and en-suites at Cygnet Hospital Harrogate, carried out in a live healthcare setting. Each room was refurbished to clinical standards with durable, hygienic finishes and calming feature walls.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Bedroom refurbishment
- 02 En-suite installation
- 03 Hygienic wall finishes
- 04 Robust, healthcare-grade fixtures
- 05 Feature-wall decoration
- 06 Working in a live clinical environment
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
2Completed
2What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Sydenham Road, Holbeck, Leeds
Quality Control Clean Laboratory for a Leeds Brewery, Holbeck
An office converted into a clean laboratory for a well-known Leeds brewer, built to hygienic standards so it can quality test and develop new beers.
View case study
Leeds, LS11 · 120 sqm
Hygienic Wall Cladding for a Brewery Production Area, Leeds
Around 120 square metres of hygienic wall cladding installed around a brewery's new production and batching area, sealed to a waterproof finish.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.