Industrial Refurbishment
Industrial Refurbishment for DX, Haigh Park, Stourton
A dated distribution building re-clad, re-shuttered and rebuilt internally, handed over ready for a national parcels operator to move in and start running.
- Location
- Stourton, Leeds
- Size
- 6,200 sq ft
- Sector
- Industrial & Logistics
- Completed
- February 2016
The brief.
Delivered asCladding, Structural, Electrical, Fit-Out
This 6,200 sq ft building at Haigh Park went from a tired, dark shell to an operational distribution depot for DX. Envelope and interior were run in parallel rather than in sequence, which is the only way to hit a handover date on a building that needs both.
Externally, new wall cladding replaced a patched and mismatched elevation, and new roller shutter doors were installed to suit vehicle access. Internally, the office accommodation was rebuilt in blockwork and stud, decorated and lit, with new roof insulation installed above.
The finished building sits on the same steel frame it always did. Everything a driver, a customer or a member of staff actually sees is new.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 New wall cladding to external elevations
- 02 New roller shutter doors for vehicle access
- 03 Blockwork and stud office rebuild
- 04 Roof insulation and sheeting
- 05 New lighting throughout
- 06 Internal decoration and finishes
- 07 External bollards and impact protection
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
3In progress
4Completed
4What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Pontefract
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.