Industrial Refurbishment
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
- Location
- Pontefract
- Sector
- Industrial & Logistics
- Completed
- 2023
The brief.
Delivered asRefurbishment & Fit-Out, Civil & Structural
A full refurbishment of an industrial unit in Pontefract, taking it from tired to let-ready. The works covered the warehouse interior, the external envelope and the supporting office and welfare space.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Epoxy resin floor
- 02 New roller shutter
- 03 External brick and cladding repairs
- 04 Office and kitchenette fit-out
- 05 Accessible WC
- 06 Decoration throughout
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
2Completed
3What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case study
Ossett, Wakefield · 3,000 sq ft
Warehouse Dilapidations & Reinstatement, Ossett, Wakefield
A unit handed back full of a departed tenant's fixtures, stripped to slab and returned to the market as a clean, brighter, better-rated blank canvas.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.