Laboratory Fit-Out
Quality Control Clean Laboratory for a Leeds Brewery, Holbeck
An office converted into a clean laboratory for a well-known Leeds brewer, built to hygienic standards so it can quality test and develop new beers.
- Location
- Sydenham Road, Holbeck, Leeds
- Sector
- Healthcare & Life Sciences
- Completed
- March 2022
The brief.
Delivered asStrip-Out, Laboratory Fit-Out, Hygienic Cladding, M&E
A well-known Leeds brewing company asked us to turn one of its office spaces into a contemporary clean laboratory, where it could quality test and develop its upcoming range of beers. The hygiene standard applied to everything: to the products our suppliers provided, and to our own fit and finish.
We stripped the room back completely, M&E included, and altered the walls to open the space up for a working lab. Antimicrobial wall cladding, a new ceiling grid and tiles, and vinyl flooring with coved skirting went in, so there are no corners for dirt to collect in. We designed and installed the laboratory itself in close conjunction with the client, and fitted all new M&E, including a new antimicrobial controlled air conditioning system.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 All existing installations removed
- 02 M&E stripped back ready for new systems
- 03 Walls altered to open up the space
- 04 Antimicrobial wall cladding installed
- 05 New ceiling grid and tiles
- 06 Vinyl flooring with coved skirting
- 07 Laboratory designed and installed with the client
- 08 All new M&E, including antimicrobial controlled air conditioning
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
3Completed
5What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Harrogate
Cygnet Hospital Harrogate, Bedroom Upgrades
Phased upgrade of patient bedrooms and en-suites in a live mental-health hospital, finished to clinical standards.
View case study
Leeds, LS11 · 120 sqm
Hygienic Wall Cladding for a Brewery Production Area, Leeds
Around 120 square metres of hygienic wall cladding installed around a brewery's new production and batching area, sealed to a waterproof finish.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.