Groundworks
Warehouse Pit Infill and New Walls, Cross Green
Old pits in a 2,500 sq ft warehouse floor cleared of rubble, backfilled and filled with concrete, with new wall construction.
- Location
- Cross Green Industrial Estate, Leeds
- Size
- 2,500 sq ft
- Sector
- Industrial & Logistics
- Completed
- March 2016
The brief.
Delivered asGroundworks, Concrete, Walls
Pits in the warehouse floor at this Cross Green Industrial Estate unit needed to be made good. We cleared them of rubble, backfilled them and filled them with concrete, and built new walls.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Existing pits cleared of rubble
- 02 Pits backfilled
- 03 Pits filled with concrete
- 04 New wall construction
Completed
4What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Pontefract
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.