Industrial Unit Dilapidations, Bradford

Dilapidations

Industrial Unit Dilapidations, Bradford

Fast-track dilapidations on a 21,500 sq ft factory for the landlord, leaving a new tenant a clean, watertight blank canvas.

Location
Kingsmark, Freeway, Bradford
Size
21,500 sq ft
Sector
Industrial & Logistics
Completed
January 2018

The brief.

Delivered asDilapidations, Cleaning, Electrical, Cladding Repairs

The managing agent, acting for the landlord, asked us to carry out dilapidation works to the former Altec unit as quickly as possible because interest in the building was high. A new tenant was secured while we were still on site.

We stripped out the previous tenant's high-level airlines, supplies, cable trays and sockets, isolated the electrics and tested the emergency lighting. The painted concrete factory floor was degreased with a ride-on scrubber dryer and resin repaired where machinery had damaged the slab, and we repainted blockwork panels around the perimeter. Outside, we cleaned the front elevation including the entrance canopy, cladding, windows and frames, removed the old sign and cleared the rear goods yard. We also traced and resolved two areas of water ingress through the cladding, then repaired the plasterwork and suspended ceilings they had damaged.

Scope of works.

Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.

  1. 01 High-level airlines and supplies removed throughout the factory floor
  2. 02 Electrics isolated; high-level trays and fixings removed, warehouse lighting trays left in place
  3. 03 Tenant-installed sockets and water supplies removed
  4. 04 Emergency lighting tested
  5. 05 Factory floor degreased with a ride-on scrubber dryer
  6. 06 Resin repairs where the floor slab had been damaged
  7. 07 Perimeter blockwork panels repainted
  8. 08 Deep clean of offices and toilets
  9. 09 Front elevation, canopy, cladding, windows and frames cleaned; old sign removed
  10. 10 Rear goods yard cleared of debris
  11. 11 Window handles repaired
  12. 12 Two areas of water ingress through the cladding traced and resolved
  13. 13 Plasterwork and suspended ceilings repaired

Completed

5