Hygienic Wall Cladding for a Brewery Production Area, Leeds

Hygienic Cladding

Hygienic Wall Cladding for a Brewery Production Area, Leeds

Around 120 square metres of hygienic wall cladding installed around a brewery's new production and batching area, sealed to a waterproof finish.

Location
Leeds, LS11
Size
120 sqm
Sector
Healthcare & Life Sciences
Completed
February 2020

The brief.

Delivered asHygienic Wall Cladding, Stud Walling

A well-known local brewery got in touch about a new production and batching area. After a site inspection and approval of our quotation, we lined its perimeter walls with approximately 120 square metres of hygienic wall cladding.

Hygienic cladding only works if the surface behind it is right and every joint is sealed. We built independent 4x2 timber stud walls to the perimeter and boarded them in plasterboard to give a solid sub-base, then installed the cladding with all the beading and sealing needed for a waterproof surface, and cleared the waste from site.

Scope of works.

Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.

  1. 01 Site inspection and quotation
  2. 02 Independent 4x2 timber stud walling to the perimeter walls
  3. 03 New stud walls plasterboarded as a solid sub-base
  4. 04 Approximately 120 sqm of hygienic wall cladding
  5. 05 All beading and sealing for a waterproof surface
  6. 06 Waste removed from site

In progress

4

Completed

3

What this project proves.

Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.

Have a project like this?

Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.

Part of The AB Group

One family. A group of companies.

Call us