New Build
New-Build Warehouse Extension for Vitafoam, Manchester
A 2,100 sq ft new-build extension to Vitafoam's workshop and warehouse: concrete floor, steel frame, and wall and roof cladding.
- Location
- Soudan Street, Middleton, Manchester
- Size
- 2,100 sq ft
- Sector
- Industrial & Logistics
- Completed
- April 2016
The brief.
Delivered asNew Build, Cladding
Vitafoam needed more workshop and warehouse space at its site in Middleton, Manchester. We built a new extension against the existing building, with a new concrete floor and a steel frame clad in new wall and roof sheeting.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 New-build extension to the workshop and warehouse
- 02 New concrete floor
- 03 Steel frame
- 04 Wall cladding
- 05 Roof cladding
In progress
4Completed
4What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Pontefract
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case studyHave a project like this?
Send us the brief, a drawing or just the postcode. Free site survey across the North and the Midlands, fixed written quote within the week.