Site Clearance
Site Clearance & Secure Controlled Parking, Holbeck
An overgrown, unsecured plot in Holbeck cleared, fenced, surfaced and turned into secure controlled parking that now earns its landlord an income.
- Location
- Springwell Road, Holbeck, Leeds
- Size
- 10,500 sq ft
- Sector
- Industrial & Logistics
- Completed
- June 2018
The brief.
Delivered asSite Clearance, Fencing, Hard Surfacing
The landlord of a parcel of land on Springwell Road and Water Lane in Holbeck wanted it cleared and secured so it could be let as controlled parking. We set out the options: general clearance, vegetation removal, perimeter fencing, access gates, and the right aggregates for a sub-base and wearing course. Once the scheme was approved we put polite notices on every car already parked on the plot, giving warning of the start date.
It was a group effort. Our sister companies Brownridge Transport and Barriers for Hire secured the perimeter before anything else moved. A tree surgeon took out the overgrown trees and dense vegetation, then we cleared the ground, demolished the remaining walls and graded the site. The 2.4m palisade went in around the perimeter using a breaker attachment on a JCB, the low areas were built up with compacted MOT Type 1, and tarmac scalpings went down as a compacted wearing course. Fox Doors, also part of the group, fabricated extended drop bolts for the gates on site and set sleeves into the ground so the gates lock safely and securely.
Where there had been a liability, there is now a secure, usable plot and an asset earning the landlord a controlled income. On the back of it, the landlord instructed us to carry out similar works on a second, smaller site.
Scope of works.
Every trade below was delivered by us or by a company in the group, under one contract and one point of contact.
- 01 Notices issued to vehicles parked on the plot
- 02 Perimeter secured by Brownridge Transport and Barriers for Hire
- 03 Overgrown trees and dense vegetation removed by a tree surgeon
- 04 General ground clearance and remaining walls demolished
- 05 Site graded off
- 06 2.4m steel palisade installed around the perimeter
- 07 Low areas built up with compacted MOT Type 1 sub-base
- 08 Tarmac scalpings laid and compacted as a wearing course
- 09 Gate drop bolts extended and ground sleeves fitted by Fox Doors
The difference.
Same building, same angle. Click any photograph to open it full size.
Before
2In progress
5Completed
3What this project proves.
Capabilities demonstrated on this job. Follow any of them for how we approach that work and where else we have done it.
More projects.
Leeds · 5 acres
Thomas Danby College, Demolish & Rebuild
Asbestos strip, full demolition of a former college, and a ground-up rebuild into a five-unit commercial trade park.
View case study
Pontefract
Warehouse Refurbishment, Pontefract
A tired industrial unit brought back to let-ready standard: epoxy floor, new shutter, cladding, welfare and office.
View case study
Morley, Leeds · 40,000 sq ft
40,000 sq ft Subdivided into Nine Units, Morley, Leeds
One 40,000 sq ft shed turned into nine separately lettable units, multiplying what the building could earn and spreading the landlord's risk across nine tenants instead of one.
View case studyHave a project like this?