Project Brief
We were asked to convert an existing warehouse mezzanine into a new office space for the client. We worked from client specification throughout the process and ensured we stuck to deadlines. This element of works made up a larger project we had agreed to complete at the unit.
Overview of works:
- Overlay durbar flooring with acoustic boarding.
- Install new insulated timber stud walls to all sides of the room.
- Split the space into 2 rooms by installing a partition wall.
- Supply and install 3no new white uPVC double glazed non opening windows.
- Brace the walls and installed 600 X 600 white suspended ceiling and grid system.
- Installed new LED flat panel lighting.
- Installed new Dado trunking.
- Installed new electric panel heaters.
- Prepare and decorate all walls and timberwork.
- Supply and install new carpet tiles.
Project Location
Leeds, Cross Green