Project Brief

We were asked to convert an existing warehouse mezzanine into a new office space for the client. We worked from client specification throughout the process and ensured we stuck to deadlines. This element of works made up a larger project we had agreed to complete at the unit.

Overview of works:

  • Overlay durbar flooring with acoustic boarding.
  • Install new insulated timber stud walls to all sides of the room.
  • Split the space into 2 rooms by installing a partition wall.
  • Supply and install 3no new white uPVC double glazed non opening windows.
  • Brace the walls and installed 600 X 600 white suspended ceiling and grid system.
  • Installed new LED flat panel lighting.
  • Installed new Dado trunking.
  • Installed new electric panel heaters.
  • Prepare and decorate all walls and timberwork.
  • Supply and install new carpet tiles.

Project Location

Leeds, Cross Green

Project Status

November 2023