Project Brief

From strip-out to the final fixtures, this project delivered a clean, durable, and highly hygienic space designed to withstand high-traffic commercial use.

With careful planning and high team performance, this space was transformed within a week!

What the Transformation Involved:

Full Strip-Out & Disposal:

  • Efficient removal of all legacy flooring, sanitary wear, cladding, cubicles, and old radiators.
Flooring:
  • Installation of heavy-duty, easy-clean cap and cove flooring.
Wall & Ceiling Upgrades:
  • Perimeter-wide installation of full-height hygienic wall cladding paired with new high-specification hygienic ceiling grid tiles.
Modern Cubicles & Facilities:
  • 6 brand-new Integrated Plumbing System (IPS Panel) cubicles matching the modern aesthetic, alongside 6 fresh sanitary wear packs.
Premium Wash Stations:
  • Installation of a multi-person urinal trough, a streamlined multi-tap stainless steel sink basin, and an efficient new radiator unit.
The final result is a bright, modern, and low-maintenance environment that perfectly aligns with standard specifications for commercial facilities.

Project Location

Glasgow

Project Status

June 2026

Completed Date