Project Brief
We were asked to replace a cracked glazing unit for a block of student flats in Leeds. We worked with the client and strategically booked the works to take place during tenancy changeover to minimize our disruption.
The job’s hardest obstacle was the access, our solution involved the efficient use of a substantial roadside boom lift, we lifted the glazing unit up to height and then fit internally.
Project Location
Leeds City centre