Project Brief
Damaged Cladding Replacement
We were contacted by a Leeds based storage company after the corner of the building had been hit by a vehicle. We undertake these type of repairs on a regular basis.
Overview of Works
- The new piece of composite cladding was made to order to ensure it matched accordingly.
- Due to the cladding being interlinked we removed the cladding from the top downwards to get to the damaged piece at the bottom that had suffered impact damage.
- We removed and replaced the damaged section of composite cladding and the drip tray, then reinstated the existing cladding like for like.
- To prevent the same incident occurring the client decided to go with our recommendation of installing a barrier to protect the corner and highlight the potential hazard.
Project Location
Rothwell, Leeds, LS10 1AX