Project Brief

We undertook extensive refurbishment works to provide the client with more of a modern refreshed feel within their offices, toilets and canteens.

In brief –

  • We installed suspended ceiling grids to hide redundant services and old looking ceilings.
  • Installed 2 new canteens for both office and warehouse staff.
  • We redecorated throughout.
  • Installed all new floor coverings in the WC’s , Canteens and corridor.
  • We revamped the 3 toilet areas , tiling halfway and plastering halfway.
  • Installed all new sanitary ware.
  • Re wired electrically and installed new LED lighting and Dyson Air blades to the WCs.
  • Installed new fire rated doors and ironmongery.

Project Location

1193 Old Ln, Halfway, Sheffield S20 3GA

Project Status

May 21 2019

Completed Date

2,100sq ft

Surface Area