Project Brief
Hygienic Wall cladding
A well-known local brewery contacted CPR Ltd. After a site inspection and subsequent approval of our quotation we created approximately 120sqms of hygienic wall cladding to perimeter walls of a new production /batching area.
Overview of Works
- Supplied and installed independent 4×2 timber stud walling to perimeter walls
- Plaster boarded new stud walls to provide a solid sub base
- Supplied and installed hygienic wall cladding including all necessary beading and sealing to provide a water proof surface.
- Removal of excess waste from site.
Project Location
Leeds LS11 9RU