Project Brief
Working on behalf of the managing agent after approval was granted through the buildings insurance we reinstated the wall like for like after it had suffered heavy impact damage from a moving vehicle.
Works in involved the following:
- Cordoned off area of work. Isolated the external lighting to the wall.
- Demolished areas that were left unstable.
- Re built the wall like for like out of double skin brick. Brick match sourced from a local builders merchant. Wall incorporating brick piers and light ‘housing’ to 1 pier to match remaining wall.
- Supplied and installed 5 number pier capping’s to match existing cappings.
- Reinstated the existing railings between piers after undertaking minor fabrication repairs.
- Supplied and installed 1 number external flood light and junction box mounted on new pier.
- Removed and disposed of all debris off site. Cleaned down areas of work with jet wash.
Project Location
Springwell Road, Holbeck, Leeds, LS12
Project Status
February 22nd 2018
Completed Date